Updates for current roadway projects:
-Birch St south of Schofield Ave will be closed starting Monday 8/25 for approximately one week.
Schofield Ave (Normandy St to Birch St):
- Week of 8/25: Work in the Birch St intersection will be taking place this week and will be closed south of Schofield Ave. Grading and electrical work throughout the corridor will be ongoing during the week.
- Week of 9/1: Curb and Gutter is planned to be installed this week along with finishing any remaining utility work.
Weston Ave (CR-X to Ryan St):
- Week of 8/25: Water and Sewer work east of Lindenwood Ct will continue with the road building from Heeren heading east.
- Week of 9/1: Crews will work on continuing to move east with utilities and follow behind with road building as utility work is completed.
Fuller St:
- Week of 8/25: Concrete work will continue north of Thomas Ave with sidewalk and driveway aprons being finished up. Road building between Schofield Ave and the Weston Manor Mobile Home Park will continue along with watermain and storm sewer work north of Weston Manor.
- Week of 9/1: Concrete work to the north should be completed with yard restoration then taking place. New watermain installation from Weston Manor heading north to Meridian.
Business Park Paving (Commerce Dr and Ryan St):
- Week of 8/25: Grading and paving of Commerce Dr from Ryan St to Rickyval St is planned along with inlet repairs on Ryan St.
- Week of 9/1: Finish any concrete repairs on Ryan St and any remaining paving or utility adjustments along Rickyval St.
Asphalt Overlay Projects:
- Asphalt overlays are planned for the below streets. Crews have or will be completing prep work ahead of the overlay paving which includes adjusting all manholes and water valves within the pavement as well as milling along the curb lines or driveways.
- Post Ave (West of BUS 51)
- Cortez, Coronado and Lawndale (North of Jelinek)
- Terrier and Birchwood Ln (South of Jelinek)
- Prairie St and Westfair St (West of Mesker)
- Alex St (West of Sandy Ln)
- Michael Dr
- Cheryl Dr
- Jacob St
- Twin Pines Ln
- Morning View (East of Twin Pines)
- Babl Ln (East of Twin Pines)
- Saxon Ave
- Regent St
- Meridian St
- Jean Ellen St
- Sternberg Ave (Scott St to Mesker St)
Shorey Ave Repaving (County Road X to Anastasia Dr): This project is expected to start around 9/2.
Weekly updates on roadway projects are released every Friday on Facebook.